Pink azaleas on the volcanic ridges of Kuju

In early summer, a small wild azalea called miyama-kirishima turns the upper slopes of the Kuju mountains in Oita Prefecture pink. The best colonies are on the ridges, so seeing them means a mountain walk.

Kuju's miyama kirishima flowers (52133520414)
Photo: Raita Futo from Tokyo, Japan

What you will see

The Kuju mountains (Kuju renzan) are a group of volcanic peaks in Oita Prefecture, Kyushu. Nakadake, at 1,791 metres, is the highest point on the Kyushu mainland. The area is part of Aso-Kuju National Park, which was first named a national park in 1934.

In early summer, a low wild azalea called miyama-kirishima flowers on these slopes. Japan's Ministry of the Environment describes it as a member of the azalea family that grows on volcanic mountainsides across Kyushu. When it blooms in May and June, whole mountainsides turn pink.

Official pages name several places for the flowers:

  • Ogigahana. A flat plateau runs east from the summit. It holds one of the largest numbers of plants in the Kuju mountains, and in June it becomes a pink carpet.
  • Hizengajo. In June, the azaleas colour the slopes of this table-shaped mountain in front of Kujusan.
  • Hoshoyama. It is a short way off the main ridge path from Makinoto Pass and is another viewing spot in June.
  • Mount Daisen. The ridge from the summit to Dannohara and Kitadaisen turns pink in June. The colony around the old craters here is one of the largest in Kuju and is a national Natural Monument.
  • Hiijidake. The visitor centre says this peak is very popular in the azalea season. It has many flowering plants and looks down on the Bogatsuru wetland.

Why this season

The ministry gives May to June as the season for the flowers. Its pages for Ogigahana, Hizengajo, Hoshoyama and Mount Daisen all name June. The official pages give no typical peak date for each mountain.

The flowers need help. The ministry says other trees and shrubs are growing over the azaleas in the Kuju mountains, so the plants are declining. Conservation work is under way. Kuju is a national park, and picking or damaging plants and animals is not allowed.

Miyama-kirishima azaleas below the summit of Mount Daisen in the Kuju mountains, June 2011. Not a current view.
Miyama-kirishima azaleas below the summit of Mount Daisen in the Kuju mountains, June 2011. Not a current view. Photo: tsuda from Tsushima, Aichi, Japan

When to go

  • Season. The ministry gives May to June, and its course pages name June. There is no official bloom forecast on the pages we checked. Before you go, ask the Chojabaru Visitor Center (0973-79-2154, during opening hours). It has nature guides on staff and shows what is in season.
  • Time of day. The last buses leave the trailheads in mid-afternoon, so start early (see below).
  • Weather. The visitor centre says mountain weather changes quickly and is often rainy. It is colder than in the lowlands, and the wind is strong on the treeless summits. Check the forecast before you go. Take special care if it warns of unstable or stormy weather, strong wind or thunder, and cancel or change your plan if needed.

Getting there and visiting

The visitor centre lists many trailheads. Two of them have bus stops:

  • Makinoto Pass is at 1,330 metres. It has 161 public parking spaces, a shop and a bus stop.
  • Chojabaru (Kuju trailhead) has the visitor centre, a shop, places to stay, a campsite and a bus stop.

Walking times. All times below come from the Ministry of the Environment and are only a guide.

  • From Makinoto Pass. A steep climb of about 25 minutes leads to Mount Kutsukake. Then the path follows an open ridge. The Ogigahana junction is about 45 minutes further. Ogigahana and Hoshoyama are a short way off this path, but the ministry gives no time for the side trips. The full course to Nakadake and back is about 5 hours 15 minutes and 11 km.
  • From Akagawa (Taketa side). The Ogigahana course starts in front of a hot-spring inn at Akagawa Onsen. It takes about 110 minutes up and 80 minutes down (4.6 km in total). There are public car parks here.
  • Hiijidake rises north-east of Bogatsuru, a wetland basin in the middle of the mountains. Mount Daisen is the main peak in the east of the range. Without the course bus, the ministry gives about 3.5 hours of climbing from the Gakurokuji trailhead.

Without a long climb. The official pages do not name a place to see the azaleas near a trailhead without a hike. If you cannot walk far, the ministry calls the Tadehara Wetland walk at Chojabaru an easy walk for anyone (see below), but it does not list the azalea there.

Buses. Rail passes do not cover these buses.

  • Kyushu Odan Bus (Sanko). Kyushu Sanko Bus, a Kumamoto bus company, runs this route between Kumamoto, Aso, Yufuin and Beppu. It stops at Kuju Tozanguchi (Chojabaru) and Makinoto Pass. Seats are limited, and part of the route takes bookings. Without a booking you may not be able to board. For bookings and questions, Sanko lists the Kumamoto Highway Bus Reservation Center (0570-09-3533, 9:00–17:00).
  • From Beppu and Yufuin. In the timetable revised on 1 October 2025 (still shown on 12 November 2026), bus No. 2 leaves Beppu Station (Ekimae-Honmachi stop) at 8:10 and Yufuin Station Bus Center at 9:10. It reaches Chojabaru at 10:02 and Makinoto Pass at 10:11. Two later buses leave Yufuin at 13:50 and 14:50.
  • From Kumamoto. Buses leave Kumamoto Station at 7:23 and 8:23 and reach Makinoto Pass at 10:57 and 11:57. They stop at Aso Kumamoto Airport on the way.
  • Kokonoe town bus. Kokonoe Town runs a community bus every day from Bungo-Nakamura Station, on the JR Kyudai Line, to Chojabaru and Makinoto Pass. It carries up to 28 people and takes no bookings. Every trip costs ¥500 for adults. From 1 December to the end of February, it does not run between Kuju Tozanguchi and Makinoto Pass. The stop for the visitor centre is Kuju Tozanguchi Miyama. There are few buses, especially on Sundays and holidays, so check the timetable (PDF, in Japanese). On the Yufu limited express in the timetable for 12 November 2026, Hakata (Fukuoka) to Bungo-Nakamura takes about 2 hours.
  • Other buses. A Kamenoi Bus service also runs between Chojabaru and Makinoto Pass on Saturdays, Sundays and holidays, but not from December to March.

By car. Chojabaru is about 30 minutes from Yufuin Interchange on the Oita Expressway by the Yamanami Highway, about 40 minutes from JR Miyaji Station in Aso, and about 40 minutes from Kokonoe Interchange.

Chojabaru Visitor Center. The centre, run by the Kuju Fan Club, has nature displays, a large satellite photo of the park and a theatre with films of the four seasons. Entry is free. It is open 9:00–17:00 (16:00 from November to April) and closed 29 December – 3 January. From the second-floor viewing room you can see the wetland and the mountains.

Tadehara Wetland. Behind the centre is Tadehara, a wetland at about 1,000 metres. At 38 hectares it is one of the largest wetlands of its type in Japan. With Bogatsuru, it was listed under the Ramsar Convention in 2005. A loop walk of about 45 minutes (2.5 km) starts at the centre. Part of the boardwalk is barrier-free. The forest path is not barrier-free but is almost flat.

Tadehara Wetland at Chojabaru, Kokonoe, Oita, May 2020. Not a current view.
Tadehara Wetland at Chojabaru, Kokonoe, Oita, May 2020. Not a current view. Photo: Raita Futo from Tokyo, Japan

Good to know

  • Volcano. Kuju is an active volcano. On 12 November 2026, the Japan Meteorological Agency (JMA) had it at level 1 of 5 on its volcanic alert scale. JMA warns that very hot volcanic gas comes out of the vents on Iozan. It also says activity may be rising slightly over the long term. Iozan cannot be climbed. Check JMA's page before your trip.
  • Trail notices. Since heavy rain in July 2026, the Ichibanmizu trailhead has been closed, with no date to reopen. Read the visitor centre's trail news (in Japanese) before you go.
  • Climbing plan. The visitor centre asks hikers to submit a climbing plan (tozan todoke), for example through the online form of the Oita Prefectural Police.
  • Clothes and gear. The visitor centre warns against hiking in light gear: unsuitable shoes or clothes and too little water raise the risk of injury and getting lost. It calls a map and a power bank essential, and suggests a paper map and a compass.
  • Toilets. There are public toilets at Makinoto Pass and at Chojabaru. Use them before you start, and carry a portable toilet. On the ridge, the toilet at the Kuju-wakare shelter is for emergencies only. It is closed from December to early April.
  • Rules. Stay on the paths, take all rubbish home, and avoid bringing pets. Flying a drone needs the landowner's permission. Camping is allowed only at set sites, not in car parks.
  • Wheelchairs and children. The visitor centre is barrier-free and lends wheelchairs and baby buggies free of charge. The official pages give no barrier-free information for the mountain trails.
  • Payment. Sanko lists contactless card payment for the Kyushu Odan Bus. The Kokonoe town page lists fares but does not mention card payment.
  • English. The visitor centre has an English page. The combined trailhead timetable has English headings. Most trail news is in Japanese only.
  • Getting back. The last Kyushu Odan Bus towards Yufuin and Beppu leaves Makinoto Pass at 15:32 and Chojabaru at 15:41. It reaches Yufuin at 16:33 and Beppu at 17:29. The last bus towards Aso and Kumamoto leaves Chojabaru at 15:32 and Makinoto Pass at 15:41. The last town bus leaves Kuju Tozanguchi Miyama at 16:41 on weekdays and 16:50 at weekends (timetable from May 2025).

Nearby and further reading

On the other side of the Yamanami Highway, Yufuin is known for its morning mist in late autumn and winter: see Yufuin's morning mist. Aso, south of Kuju, holds a fire rite in March: see Aso Shrine's Hifuri rite. For other ideas for the season, see June in Japan. For rail passes and IC cards, see Getting around Japan.

Dates for 2027

  • Bloom. No official bloom forecast for 2027 had been published as of 12 November 2026. The typical season is May to June.
  • Opening day of the mountains. The visitor centre says the yearly opening ceremony (yamabiraki) takes place on Kujusan and Mount Daisen in turn. The 2027 date had not been announced as of 12 November 2026.
  • Bus timetables. On 12 November 2026, the Kyushu Odan Bus timetable dated from 1 October 2025 and the town bus timetable from 7 May 2025. Check both close to your trip.

Before you go

  • Where | Kuju mountains, Kokonoe and Taketa, Oita Prefecture (Kyushu), in Aso-Kuju National Park. Main trailheads: Makinoto Pass (1,330 m) and Chojabaru
  • When | Typically May to June. The Ministry of the Environment names June for Ogigahana, Hoshoyama and Mount Daisen
  • Volcano | Kujusan was at volcanic alert level 1 on 12 November 2026 (Japan Meteorological Agency). Iozan, the steaming peak, cannot be climbed
  • Getting there | Kyushu Odan Bus (Sanko) from Beppu, Yufuin or Kumamoto to Chojabaru and Makinoto Pass, or the Kokonoe town bus from Bungo-Nakamura Station. Rail passes do not cover these buses
  • Visitor centre | Chojabaru Visitor Center: free, 9:00–17:00 (to 16:00 from November to April), closed 29 December – 3 January
  • Checked | 12–25 November 2026 · 22 official sources

Sources

Sources (22) · checked 12 November 2026

Photo credits

JAPAN IN MOMENTS — home